Leachate Treatment Plant (LTP) Upgrade Design/Permitting


Leachate Management System evaluation, upgrade, design, and permitting of 25 year old LTP that serves a 500 ton/day municipal waste landfill. When effluent results indicate exceedances of pretreatment limits for arsenic, leachate must be hauled to offsite disposal.
Project Highlights
LTP DESIGN EVALUATION
- Basis of Design (BOD) Report and LTP Process Flow design drawings.
- MBBR Bench Scale Pilot Test
- Cathodic Protection Tank Evaluation
LEACHATE TREATMENT PLANT DESIGN
- Equipment Design Specifications for Equalization Tanks, MBBR, DAF Units, Arsenic Co-Precipitation, Sludge Management System
- Geotechnical Engineering and Land Surveying
- Land Development, Permitting, Building and Structural Design Engineering
- Mechanical, Process, Electrical and System Integration Engineering
- Bid Phase Engineering Support
Client Benefits
- Project in Progress
- These upgrades will improve the overall operational efficiency and will provide pretreatment necessary to meet regulatory requirements for discharge to a local POTW.