Leachate Treatment, Storage and Conveyance

Bucks County, PA
Grows Landfill

Design & Bid Package Development for the construction of leachate pretreatment components and 5-mile long conveyance system with advanced integrity monitoring and operational controls capabilities

Project Highlights

  • Managed design and development of four (4) separate Bid Packages and evaluations of cost-reduction measures:
  • Effluent Force Main
  • Landfill Leachate Force Main
  • Wetland Restoration
  • Leachate Treatment and Effluent For Main Support Components
  • Reduced risk and prevented environmental impacts to wetlands and other ecologically-sensitive areas by designing the 5-mile pipeline with the following:
  • Dual-contained HDPE piping
  • Continuous solar-powered monitoring system w/ radio telemetry
  • Strategically located repeater stations
  • Multiple valve station/air release vaults with liquid detection sensors
  • Control system that polls the monitoring system every few seconds for pipeline pressure and vault liquid detection
  • Provided Construction Support

Client Benefits

  • A Control System that allows operators to select flow rate and total daily flow to the POTW.
  • System operates continuously with pipeline “surge” cycles at higher scour velocity or in batch cycles during low flow conditions.
  • Lower project capital cost than traditional hard-wired systems

Testimonial

“This project exceeded our expectations by providing a high degree of control and environmental protection using technology that had a lower capital cost than the in-ground, hard-wired systems we were using.” – Client