Leachate Treatment, Storage and Conveyance


Design & Bid Package Development for the construction of leachate pretreatment components and 5-mile long conveyance system with advanced integrity monitoring and operational controls capabilities
Project Highlights
- Managed design and development of four (4) separate Bid Packages and evaluations of cost-reduction measures:
- Effluent Force Main
- Landfill Leachate Force Main
- Wetland Restoration
- Leachate Treatment and Effluent For Main Support Components
- Reduced risk and prevented environmental impacts to wetlands and other ecologically-sensitive areas by designing the 5-mile pipeline with the following:
- Dual-contained HDPE piping
- Continuous solar-powered monitoring system w/ radio telemetry
- Strategically located repeater stations
- Multiple valve station/air release vaults with liquid detection sensors
- Control system that polls the monitoring system every few seconds for pipeline pressure and vault liquid detection
- Provided Construction Support
Client Benefits
- A Control System that allows operators to select flow rate and total daily flow to the POTW.
- System operates continuously with pipeline “surge” cycles at higher scour velocity or in batch cycles during low flow conditions.
- Lower project capital cost than traditional hard-wired systems
Testimonial
“This project exceeded our expectations by providing a high degree of control and environmental protection using technology that had a lower capital cost than the in-ground, hard-wired systems we were using.” – Client