Ultra Low Emission (ULE) Landfill Gas Flares – Solid Waste Permit Application and Engineering Design

Developed major permit modification applications and engineering design to install five (5) ULE landfill gas flares to control 30,000 SCFM of landfill gas at four (4) separate sites due to the impending decommissioning of the power generating facility to which the gas was conveyed.
Project Highlights
- Utility Location and As-Built Surveys
- Geotechnical Investigations for Flare Foundations
- Engineering design and construction bid documents for the installation of the following system components:
- ULE Flares
- Associated Blowers
- Condensate Pump Station
- Mechanical and Electrical
- Bid Document Development
- Bid Administration
- Construction Engineering Support
Benefits to Client
- Two (2) central locations for ease of operations and maintenance.
- Maintained Facility Compliance
- Minimized Environmental Impact